The Pingtung Line () is part of the West Coast line of Taiwan Railway.
It is long, of which is double track.
The section between Nanzhou and Linbian railway stations will be upgraded from a single-track railway to a double-track railway in December 2019 while the section between Chaozhou and Nanzhou, and the section between Linbian and Fangliao is expected to remain in single-track.
Taiwanese government stated in 2007 that it reserved the possibility to upgrade the entire section to dual-track railway when the number of travelers through Pingtung Line reaches a certain level
Aside from electrifying the tracks, the following upgrades were carried out simultaneously:
The infrastructure was completed in October 2019, and beginning on November 8, test runs using electric trains were carried out on the line. The electrified tracks officially entered service on December 23, 2019.
Kô-hiùng | → West Coast line | Kaohsiung |
Mìn-chhu̍k | ||
Khô-kûng-kón | ||
Chang-ngi | ||
Fung-sân | Fengshan | |
Heu-chông | Daliao District | |
Kiú-khiuk-thòng | Dashu District | |
Liuk-khoài-chhṳ̀ | Pingtung County | |
Linluo | ||
Zhutian | ||
Chaozhou | ||
Kanding | ||
Nanzhou | ||
Linbian | ||
Jiadong | ||
Fangliao | ||
→ South-link line |
|
|